TOMECO HAS SUCCESSFUL SUCCESS FOUNDATION FAN BRICKS TUYNEN TILES FOR CUSTOMERS – INTERNATIONAL QUALITY PRODUCTS WITH MIND SERVICE. SUMMARY OF SPECIFICATIONS: Flow: 10,000 – 200,000m3 / h Pressure: 2,000-800PA Engine capacity: 5,5-160kW Working temperature: up to 200 ° C Mounting type: indirectly through belt / straight shaft connection through elastic coupling Fabrication material: SS400…
Apr
Industrial centrifugal fan TOMECO installs for the project to upgrade and expand production lines at the factory in Bac Thang Long Industrial Park, Noi Bai.
Jun
Industrial fan products TOMECO installed to serve smoke exhaust system for fire protection – gas supply / smoke from industrial kitchen at the project of processing facility of Noi Bai Air Catering Joint Stock Company.
May
Today, November 1, 2017 Global Mechanical and Electrical Joint Stock Company conducts checking and balancing dynamics at the scene for customers. Here are some pictures of TOMECO fan test:
Nov
Today TOMECO conducts checking and balancing dynamics at the scene of Luu Xa steel refining factory of Thai Nguyen Iron and Steel Joint Stock Company. The impeller has a diameter of 3500mm for a fan with a capacity of 1000kw.
Oct
Vimeco apartment project is in the total of the project chain of Trung Hoa Nhan Chinh – Trung Van area which has been completed and put into use, high-end apartment CT4 Vimeco is the second phase of Vimeco Nguyen Chanh project. The project invested by VIMECO Joint Stock Company, Hai Phat Real Estate Joint Stock…
Oct
TOMECO designed heat-resistant centrifugal fan for smoke-free boiler designed and manufactured directly at TOMECO An Khang factory, meeting ISO 9001: 2008 standard. With flow: 1080 – 60,000 (m³ / h) – Total pressure: 1000 – 7500Pa – Permissible air temperature: up to 350 ° C depending on the design.
Sep
Jet fan product co-production between TOMECO and famous fan manufacturer from Spain – SODECA was installed at the apartment building N03-T5. With a prime location in Ngoai Giao Doan Urban Area, Xuan Dinh, Tu Liem, Hanoi, N03-T5 apartment complex includes 1 21-storey tower and 2 basements with a construction area of over 1500 m2. The…
Aug